Here's one more from the Hotchkis site. $567 for the kit.
Has anyone tried taking 2x2 or the next size tubings and fabricating connectors that are notched and channeled at the rear floor pans, so the pans don't need cutting? It seems like an easy enough construction if you can cut and weld. I don't mind welding to the front frame or the rear frame. What about using smaller tubing tied to the rocker pinch weld? Has anyone with computer aided mechanical design (finite element analysis) looked at this?
2x2 tubing is too big. you would needa 1 1/2"x3" tubing to not be seen. ive got 2x2 under my car now for the rottisserie, sandwiched to the floorpans and you can see 1/2" of the tub. would be better with thinner but wider tube. i'll be designing a set of connectors that are not necessary to penetrate the floor. when i do, i'll post measurements and instruction on building them that anyone of the members here will be able to understand! even be able to weld them YOURSELF!
Andy
due to budget cutbacks, the light at the end of the tunnel has been disconnected for non payment.