Well I have most of the structure worked out now. Springs are all in and I just put the first layer over the back last night. Got the frame all de-rusted, rebuilt and painted. Next is the padding. I think they used 2" cotton batting orig. I may go with some synthetic pad this time. Got my floor brackets from Ames yesterday. Couple little issues but I should be able to adjust them with a BFH and use them. Got the new PUI cover set and the carpet for the back too. I'll post some pics tonight. Should be going in soon.
I assume when it goes in that the cover moulding that runs along the top of the back is supposed to sit on top of the package tray. Anybody know if this is correct?