Lots of Revit drafters here, but I think they want to stay where its relatively warm
...and yes, business is picking up...which dammit means less time in the shop....
Gus I have a toilet roughed in in mine but until the final inspection is done I can't break open the skim coat on my box out! I put in a clandestine mini septic for it. Those ^%%& engineers ( ) and septic installers wanted a fortune to review and sign off or design on my existing system, when I built a perfectly good mini system for a few hundred dollars plus gravel, sand and excavator time. I hope the inspector does not own an FGF
Last edited by Dave's Langley '68 Droptop; 02/22/1310:14 PM.