Started tackling the firewall. I cut out the two rust holes by the doors. Not much welding to do for the patches. I also ordered the pedals and covers. Going to weld the necessary patches and seam seal the firewall. After it spraying matte black and coating the underside with bed liner, I'll run the gas and brake lines and mount the subframe.