The block will not shift if the bar is pour into the footer and extended into the core holes. Grouted solid.If your footings slide your poured wall will slide. Yes the tar is flexible enough. But then again Im a bricklayer and have laid a few basements. Still 30k is a lot of money left on the table. .02